2 Season ~ Winter & Construction…List of ROAD construction to begin!

CONSTRUCTION UPDATE REPORT

Will

Effective: 03/05/12 8:06 AM

LOCATION AND DESCRIPTION MUNICIPALITY
START DATE
EST. STOP DATE
COST (millions)
COMMENTS
Renwick RoadNew alignment of Renwick Road Plainfield Township
10/2011
10/2012
$7.429
IMPACT ON TRAVEL: 83126 Project consists of constructing Renwick Road on a new alignment across the Canadian National/Elgin Joliet & Eastern Railroad and the DuPage River, construction of a five-span 623′-9″ structure utilizing 44″ welded plate girders, the reconstruction of River Road, located two miles southwest of Plainfield over the DuPage River in Plainfield Township.
143rd Street, ComEd right-of-wayConstruction of a bituminous bike trail Homer Glen
7/2010
12/2011
$1.081
IMPACT ON TRAVEL: Project consists of the construction of a bituminous bike trail and the installation of pedestrian signals including excavation, HMA, curb and gutter, sidewalk, pavement markings, storm sewers, landscaping and all other incidental items to complete the work from Parker Road south of 143rd Street to south of 135th Street and from Bell Road south of 143rd Street northeast to the Will-Cook Road and on the ComEd right-of-way with roadway crossings at Parker Road, Golden Oak Drive, Pine Grove Drive, Bell Road, and 143rd Street and on the ComEd right-of-way from Pin oak Drive to Beaver Lake Drive in the Village of Homer Glen.
151st Street.Widening and resurfacing. Lockport
5/2008
11/2011
$2.955
IMPACT ON TRAVEL: 83956 Widen and resurface 151st Street from Archer Avenue easterly for 0.72 mile and 0.30 mile on Archer Avenue north and south of 151st Street, also includes 0.04 mile reconfiguration of an access driveway as the 4th leg of the intersection with proposed 151st Street at Archer Avenue (total 1.06 miles) including drainage, curb & gutter and traffic signals in Lockport.
88th AvenueBridge, new single span abutment Green Garden Township
4/2011
12/2011
$1.058
IMPACT ON TRAVEL: 63156 Project consists of the removal of the existing single span-closed abutment bridge, construction of a new single-span, open abutment bridge (33″ depth), aggregate roadway and all other incidental items to complete the work on 88th Avenue over Forked Creek in Green Garden Township.
Barney DriveBridge replacement Joliet
8/2011
12/2011
$0.426
IMPACT ON TRAVEL: 63571 Remove existing triple barrel corrugated metal pipe arch culvert 69′ long and construct a double barrel (10-0″ X 5′-6″) reinforced concrete box culvert, on Barney Drive near Campbell St. and crossing over to Rock Run Tributary Number Three, between Fairway Drive and Campbell Street in the City of Joliet.
Black Road at River RoadParkway restoration and bike path, widening and resurfacing. Shorewood
8/2011
12/2011
$1.09
IMPACT ON TRAVEL: 63562 Project consists of HMA widening and resurfacing, curb and gutter, sidewalk, HMA bike path, maintain existing temporary traffic signal, new permanent traffic signal, relocating and installing new decorative street lights, parkway restoration and all other incidental items to complete the work on FAU Route 298 (Black Road) at River Road in the Village of Shorewood.
Boughton RoadResurfacing Bolingbrook
5/2012
9/2012
$2.035
IMPACT ON TRAVEL: 63621 Project consists of HMA surface removal and resurfacing with leveling binder and HMA surface course, pavement reconstruction over utility trench, pavement marking and all incidental and collateral items to complete the work on Boughton Road from Sunshine Drive to Schmidt Road in the Village of Bolingbrook.
Bruce Road/163rd StreetResurfacing, sidewalks. Lockport
5/2010
9/2011
$0.391
IMPACT ON TRAVEL: 63352 1.21 miles surface removal, leveling binder, HMA surface, aggregate shoulders, curb and gutter, sidewalks and detectable warnings on Bruce Road from Farrell Road to Gougar Road and on 163rd Street from Farrell Road to I 355 in Lockport.
Cedarwood DriveResurfacing, storm sewer, and curb and gutter. Crest Hill
8/2011
12/2011
$0.518
IMPACT ON TRAVEL: 63586 Project consists of the removal and construction of full-depth HMA pavement along with earth excavation, storm sewer, combination curb and gutter, PCC driveway pavement and all other incidental items to complete the work on FAU Route 328 (Cedarwood Drive) from Theodore Street to 2,230 feet south of Theodore Street in the city of Crest Hill.
Center RoadResurfacing and widening Frankfort
9/2010
12/2011
$2.638
IMPACT ON TRAVEL: 63248 Widening and resurfacing project consisting of construction curb and gutter and a closed storm sewer system, sidewalk and driveway construction, utility structure adjustments and reconstruction, temporary and permanent signing and pavement markings and all other incidental items to complete the work on FAU Rte. 3759 (Center Road) from Laraway Road to Sauk Trail in the Village of Frankfort.
DuPage River TrailBike trail construction Plainfield Park District in Plainfield
7/2010
9/2011
$1.819
IMPACT ON TRAVEL: 63325 Improvement consists of (0.77 miles) of bike trail construction including HMA 10 foot surface, one pre-fabricated bridge structure and two box culverts, retaining wall, prairie seeding and paint pavement marking on the DuPage River Trail from north of the intersection of IL Rte. 59 and Naperville Road northerly thru Riverview Park to Prairie Creek Development in Plainfield Park District in Plainfield
I-55Fiber optic cable installation Will County
10/2010
6/2012
$2.089
IMPACT ON TRAVEL: 60J24 Fiber optic cable installation for highway surveillance along I-55 from Lorenzo Road to I-80 in Will County.
I-55Fiber optic cable installation for highway surveillance. Shorewood and Romeoville
10/2010
6/2012
$2.998
IMPACT ON TRAVEL: 60K06 Fiber optic cable installation for highway surveillance on I-55 from I-80 to Naperville Road (Shorewood to Romeoville).
I-55Guardrail installation at various locations Plainfield, Romeoville, Bolingbrook, Lemont, Burr Ridge and Darien.
10/2011
12/2011
$0.241
IMPACT ON TRAVEL: 60P47 Guardrail installation at various locations along I-55 from U.S. Route 6 to I-294 in Plainfield, Romeoville, Bolingbrook, Lemont, Burr Ridge and Darien in Will and DuPage Counties.
OTHER COMMENTS: also in DuPage
I-55 (South Frontage Road)Drainage improvement Bolingbrook
3/2012
7/2012
$0.445
IMPACT ON TRAVEL: 60A56 Drainage improvement along I-55 (South Frontage Road) east of IL Route 53 in Bolingbrook.
I-55 @ Arsenal RoadInterchange ramp and frontage road reconstruction. Will County
11/2010
7/2012
$13.697
IMPACT ON TRAVEL: 60C31 Interchange ramp and frontage road reconstruction on I-55 at Arsenal Road in Will County.
I-55 at Arsenal RoadBridge removal/demolition relocation Channahon
8/2011
10/2012
$37.473
IMPACT ON TRAVEL: 60F12 Interchange reconstruction to relocate the I-55 at Arsenal Road Interchange including construction of the new interchange, flyover bridge, Arsenal bridge, lighting, removal of the existing interchange and bridge, beginning south of the existing Arsenal Bridge in Channahon, continuing north on I-55.
I-80Construction of additional lanes, and signing. New Lenox
4/2011
12/2011
$10.451
IMPACT ON TRAVEL: 60I47 3.26 miles of construction of additional driving lane, signing, surveillance and other work on I-80 from U.S. Route 30 to the Norfolk Southern Corporation Railroad in New Lenox.
I-80Noise barriers Joliet
11/2011
8/2012
$3.505
IMPACT ON TRAVEL: 60N86 Noise barriers to be constructed at five warranted locations along I-80 between Parker Road and Wolf Road located one mile east of Joliet.
I-80Resurfacing, bridge rehabilitation of 7 structures. Troy and Joliet Townships
5/2011
12/2011
$5.991
IMPACT ON TRAVEL: 60M65 8.60 miles of roadway resurfacing, bridge rehabilitation of 7 structures, signing improvements and other work on westbound I-80 from Grundy County Line to Midland Avenue in Troy and Joliet Townships.
TRAFFIC ALERT: Overnight and weekend land closures. Please drive carefully.
I-80Milling, resurfacing, bridge repairs at 8 structures. Joliet, Rockdale, and New Lenox
5/2011
12/2011
$9.168
IMPACT ON TRAVEL: 60M64 6.40 miles of milling, patching, resurfacing and bridge repairs at 8 structures all on eastbound I-80 from Midland Avenue to west of US 30 in Joliet, Rockdale and New Lenox.
TRAFFIC ALERT: One lane closed from 5/15 to 7/1/2011, and 7/5/ to 8/15/2011. Expect delays.
I-80Widening for additional lanes, signing. Mokena and Orland Park
4/2011
12/2011
$12.14
IMPACT ON TRAVEL: 60M59 4.54 miles of widening for additional lanes, signing, surveillance and other work along I-80 from the Norfolk Southern Corporation Railroad to U.S. Route 45 in Mokena and Orland Park.
I-80Milling, resurfacing, and bridge repairs at 6 locations. Troy and Joliet Townships.
5/2011
11/2011
$7.169
IMPACT ON TRAVEL: 60M63 8.60 miles of roadway resurfacing, bridge rehabilitation of 7 structures, signing improvements and other work on I-80 eastbound from Grundy County Line to Midland Avenue in Troy and Joliet Townships.
TRAFFIC ALERT: Overnight and weekend lane closures.
I-80Milling, resurfacing, bridge repairs to 9 structures. Joliet, Rockdale, New Lenox
5/2011
11/2011
$8.842
IMPACT ON TRAVEL: 60M66 6.40 miles of milling, patching, resurfacing and bridge repairs to 9 structures all located on westbound I-80 from Midland Avenue to west of US 30 (Westbound) in Joliet, Rockdale and New Lenox.
TRAFFIC ALERT: Beginning 7/12/2011 there will be one lane open in each direction and traffic will be able to enter and exit on ramps.
IL 113Street lighting, light poles and decorative luminaires. Braidwood
7/2010
9/2011
$0.216
IMPACT ON TRAVEL: 63433 0.33 mile street lighting including metal foundations, lighting controller, ornamental light poles and decorative luminaires along IL Route 113 from +/-500 ft west of Center Road +/-500 west of Mitchell Street in the City of Braidwood
IL 50 (Governor’s Highway)Lighting and traffic signals Monee
4/2012
8/2012
$2.198
IMPACT ON TRAVEL: 60445 Lighting and traffic signal modernization at the intersection of IL 50 (Governor’s Highway) and Court Street in Monee
IL 53Resurfacing Unincorporated Will County
8/2011
7/2012
$3.399
IMPACT ON TRAVEL: 60N05 4.32 miles of resurfacing on IL Route 53 from Hoff Road to Arsenal Road in unincorporated Will County.
IL 53 (Ruby Street)Bridge repairs, handrail, timber sidewalk replacement. Joliet
4/2012
8/2012
$2.117
IMPACT ON TRAVEL: 62714 Bridge repairs including painting, scour repair, bridge tender house rehabilitation, timber sidewalk removal and replacement and handrail repair to the structure carrying IL Route 53 (Ruby Street) over the Des Plaines River.
IL 59Landscaping and vegetation management Unincorporated Will County, Joliet and Plainfield, Shorewood
7/2011
5/2012
$0.448
IMPACT ON TRAVEL: 60M67 Landscaping and vegetation management on IL 59 from I-55 to IL 126 (Main Street) in Shorewood, unincorporated Will County, Joliet and Plainfield.
IL 59/US 30Intersection reconstruction, new storm sewer, water main, traffic signals. Plainfield
6/2009
12/2011
$7.913
IMPACT ON TRAVEL: 60E73 Intersection reconstruction of IL Route 59 and US Route 30, new storm sewer, water main, traffic signals, lighting and other work located in Plainfield.
OTHER COMMENTS: 2 lane highway with daytime lane closures between IL 126 and Union St. Expect delays.
Indiana AvenueBridge replacement Will County
5/2012
11/2012
$1.15
IMPACT ON TRAVEL: 63617 Project consists of the removal and replacement of the single span concrete girder bridge, pavement reconstruction, earth excavation, aggregate subgrade, HMA binder and surface courses and all other incidental items to complete the work on Indiana Avenue over Trim Creek in Will County.
Intersection of US 30 and Wolf RoadInstallation of street lighting system, poles, controller cabinet and minor parkway restoration. Mokena
5/2010
9/2011
$0.248
IMPACT ON TRAVEL: 63250 0.9 mile installation of a street lighting system including conduits, poles, controller cabinet and minor parkway restoration at the intersection of US Rte. 30 and Wolf Road in Mokena.
Lily Cache LaneWidening to two 11′ lanes in each direction, left turn lanes. Bolingbrook
10/2009
9/2011
$3.569
IMPACT ON TRAVEL: 63093 Project consists of widening to two eleven-foot lanes in each direction, left turn lanes at intersections and a raised median including an enclosed drainage system, combination concrete curb and gutter, a full-depth pavement structure, concrete sidewalk, side road improvements, private and commercial entrance improvements, traffic signal improvements, lighting improvements, culvert replacement, landscaping, pavement markings and all other incidental items to complete the work on Lily Cache Lane from Schmidt Road to IL Route 53 in the Village of Bolingbrook.
Lindsey Lane, Orchard Dr., Lily Cache LaneTwo through lanes, new storm sewers, traffic signals Bolingbrook
4/2011
12/2011
$4.645
IMPACT ON TRAVEL: 63503 Reconstruct roadway to provide two through lanes in each direction, new storm sewer, curb and gutter, raised medians, sidewalks, modify existing traffic signals at Lindsey Lane and install new signals at Orchard Drive and new roadway lighting, located along Lily Cache Lane from Veterans Parkway to Creekside Drive in Bolingbrook.
US 30Roadway reconstruction, widening, resurfacing, traffic signals. Frankfort, Frankfort Township
5/2011
11/2012
$30.486
IMPACT ON TRAVEL: 62478 3.15 miles of roadway reconstruction, widening, resurfacing and installation of storm sewers, water main and traffic signals on US Rte. 30 in Frankfort and Frankfort Township.
US 30Resurfacing, widening, storm sewers, and traffic signals Frankfort, Mokena, New Lenox, Frankfort Township
5/2011
11/2012
$42.986
IMPACT ON TRAVEL: 62479 5.39 miles of roadway reconstruction, widening, resurfacing and installation of storm sewers, and traffic signals on US Rte. 30 from Williams St. to US 45 in New Lenox, Mokena, and Frankfort.
VariousBridge work Cook and Will Counties
8/2011
10/2011
$0.265
IMPACT ON TRAVEL: 60L54 Concrete barrier wall and bridge parapet repairs on bridges at various locations in Cook & Will Counties.
Various locationBridge painting Peotone and Chicago
5/2011
11/2011
$1.067
IMPACT ON TRAVEL: 60L83 Bridge painting of 7 structures at various locations in Peotone and Chicago.
OTHER COMMENTS: Also in Chicago
Weber RoadBridge reconstruction Bolingbrook
8/2011
12/2011
$0.672
IMPACT ON TRAVEL: 63576 Project consists of the removal of the existing superstructure, construction of a new precast, prestressed concrete deck beam (21″ depth), bridge approach pavement and all other incidental items to complete the work on FAP Route 856 (Weber Road) over the East Branch DuPage River in the Village of Bolingbrook.
West River RoadBox culvert replacement. Wilmington
3/2011
12/2011
$0.432
IMPACT ON TRAVEL: 60J17 Removal of an existing box culvert and replacement with an 8’X8′ precast box culvert carrying West River Road over an unnamed tributary to the Kankakee River located just south of Wilmington.
Wolf Road at 183rd St/Orland ParkwayIntersection improvement/traffic signals Orland Park
9/2011
7/2012
$0.941
IMPACT ON TRAVEL: 60K66 Intersection improvement and new traffic signal installation on Wolf Road at 183rd Street/Orland Parkway in Orland Park.
OTHER COMMENTS: Also in South Cook

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s